South Side of Old Bethnal Green Road
The following tables identify by block the refurbishment works proposed in the first 4 years if the transfer goes ahead. | Southwood Smith
|
Essential works to bring all properties up to a good standard | |
Structural Works | |
Concrete and brickwork repairs | y |
External decorations and works to entrance screens | y |
Cavity wall insulation | y |
Flat roof repair / renewal | y |
Parapet repairs | y |
Pitched roof overhaul | |
Additional roof insulation | |
Asphalt and balcony repairs | y |
Internal Refurbishment | |
New kitchen, bathroom and WC | y |
New or overhauled heating system | y |
New double glazed windows | y |
Overhaul existing windows | |
Replace / overhaul front entrance door | y |
Rewiring or repair existing electrical installations | y |
Internal repairs and asbestos removal | y |
Services | |
Underground drainage repairs | y |
Overhaul / replace rainwater goods as necessary | y |
Repairs and decoration to communal areas | y |
Full replacement of electric laterals and risers | |
Overhaul water tanks | y |
Bin chamber refurbishment | y |
Overhaul refuse chute | |
Lightning protection | y |
Replace block lights as necessary | y |
Overhaul door entry system | |
CCTV installation
(subject to consultation) | y |
Lifts | |
Overhaul of existing lift | |
Works to areas around blocks | |
Fencing repairs and decorations | y |
Semi-defensible space to ground floor flats | |
Improve hard landscaping and signage | y |