South Side of Old Bethnal Green Road  
The following tables identify by block the refurbishment works proposed in the first 4 years if the transfer goes ahead.  | William Rathbone 
    | 
Essential works to bring all properties up to a good standard  |    | 
Structural Works  |    | 
Concrete and brickwork repairs  | y  | 
External decorations and works to entrance screens  | y  | 
Cavity wall insulation  | y  | 
Flat roof repair / renewal  | y  | 
Parapet repairs  | y  | 
Pitched roof overhaul  |    | 
Additional roof insulation  |    | 
Asphalt and balcony repairs  | y  | 
Internal Refurbishment  |    | 
New kitchen, bathroom and WC  | y  | 
New or overhauled heating system  | y  | 
New double glazed windows  |    | 
Overhaul existing windows  | y  | 
Replace / overhaul front entrance door  | y  | 
Rewiring or repair existing electrical installations  | y  | 
Internal repairs and asbestos removal  | y  | 
Services  |    | 
Underground drainage repairs  | y  | 
Overhaul / replace rainwater goods as necessary  | y  | 
Repairs and decoration to communal areas  | y  | 
Full replacement of electric laterals and risers  |    | 
Overhaul water tanks  | y  | 
Bin chamber refurbishment  | y  | 
Overhaul refuse chute  |    | 
Lightning protection  | y  | 
Replace block lights as necessary  | y  | 
Overhaul door entry system  |    | 
CCTV installation  
(subject to consultation)  | y  | 
Lifts  |    | 
Overhaul of existing lift  |    | 
Works to areas around blocks  |    | 
Fencing repairs and decorations  | y  | 
Semi-defensible space to ground floor flats  |    | 
Improve hard landscaping and signage  | y  |