- What is the condition of the roof? Does it need a pitched roof installed?
- Does the block need cavity wall insulation?
- Do the windows need renewing?
- Is the security of the parking areas an issue?
- Should the alleyways between blocks be secured with boundary fences and security gate entry systems?
- Should all garden fences be of the same standard?
- The majority of the block is leasehold. Do leaseholders want work kept to a minimum?
|
Jeremy Bentham House | 30 | 12 | 18 | 1972 |
Category Description | Group Name | Total over 30 years |
|
|
| Catch Up Repairs | Ancilliary buildings | 1,145 | Catch Up Repairs | Boundaries | 326 | Catch Up Repairs | Decorations | 9,846 | Catch Up Repairs | Electrics | 1,049 | Catch Up Repairs | Floor coverings | 1,576 | Catch Up Repairs | Floors | 2,734 | Catch Up Repairs | Garages | 687 | Catch Up Repairs | Internal doors | 5,029 | Catch Up Repairs | Kitchens | 11,335 | Catch Up Repairs | Plasterwork | 1,122 | Catch Up Repairs | Roof | 687 | Catch Up Repairs | Sanitary ware | 909 | Catch Up Repairs | Stairs/Balconies/Security | 974 | Catch Up Repairs | Structure | 190,374 | Future Major Repairs | Ancilliary buildings | 6,450 | Future Major Repairs | Boundaries | 4,184 | Future Major Repairs | Decorations | 49,230 | Future Major Repairs | Electrics | 35,060 | Future Major Repairs | External doors | 6,635 | Future Major Repairs | Floor coverings | 4,036 | Future Major Repairs | Garages | 1,254 | Future Major Repairs | Heating/hw | 28,355 | Future Major Repairs | Internal doors | 3,550 | Future Major Repairs | Kitchens | 45,911 | Future Major Repairs | Lighting | 5,152 | Future Major Repairs | Rainwater goods | 5,605 | Future Major Repairs | Roof | 11,332 | Future Major Repairs | Sanitary ware | 22,277 | Future Major Repairs | Stairs/Balconies/Security | 9,983 | Future Major Repairs | Structure | 5,152 | Future Major Repairs | Walls | 3,143 | Future Major Repairs | Windows | 52,207 | Block Improvements | Stairs/Balconies/Security | 32,100 | Dwelling Improvements | Electrics | 4,160 | Dwelling Improvements | Kitchens | 229 | Dwelling Improvements | Walls | 120,215 | | TOTAL | 684,012 |
South Side of Old Bethnal Green Road
The following tables identify by block the refurbishment works proposed in the first 4 years if the transfer goes ahead. | Jeremy Bentham
| Essential works to bring all properties up to a good standard | | Structural Works | | Concrete and brickwork repairs | y | External decorations and works to entrance screens | y | Cavity wall insulation | y | Flat roof repair / renewal | y | Parapet repairs | y | Pitched roof overhaul | | Additional roof insulation | | Asphalt and balcony repairs | y | Internal Refurbishment | | New kitchen, bathroom and WC | y | New or overhauled heating system | y | New double glazed windows | y | Overhaul existing windows | | Replace / overhaul front entrance door | y | Rewiring or repair existing electrical installations | y | Internal repairs and asbestos removal | y | Services | | Underground drainage repairs | y | Overhaul / replace rainwater goods as necessary | y | Repairs and decoration to communal areas | y | Full replacement of electric laterals and risers | | Overhaul water tanks | y | Bin chamber refurbishment | y | Overhaul refuse chute | | Lightning protection | y | Replace block lights as necessary | y | Overhaul door entry system | | CCTV installation
(subject to consultation) | y | Lifts | | Overhaul of existing lift | | Works to areas around blocks | | Fencing repairs and decorations | y | Semi-defensible space to ground floor flats | | Improve hard landscaping and signage | y |
|
|
|