- What is the condition of the roof? Does it need to be replaced by a pitched roof?
- Does the block and the surrounding grassed areas need a secondary door entry system with boundary fences?
- Should the ground floor properties have defenceable space
- Would the block benefit from an Underground Refuse System?
|
Florida Street (37-53 odd) | 9 | 4 | 5 | 1957 |
Category Description | Group Name | Total over 30 years |
|
|
| Catch Up Repairs | Ancilliary buildings | 166 | Catch Up Repairs | Boundaries | 7,213 | Catch Up Repairs | Decorations | 11,105 | Catch Up Repairs | Electrics | 8,393 | Catch Up Repairs | Floor coverings | 1,491 | Catch Up Repairs | Heating/hw | 912 | Catch Up Repairs | Internal doors | 148 | Catch Up Repairs | Kitchens | 17,002 | Catch Up Repairs | Plasterwork | 286 | Catch Up Repairs | Roof | 11,420 | Catch Up Repairs | Sanitary ware | 1,615 | Catch Up Repairs | Stairs/Balconies/Security | 1,144 | Catch Up Repairs | Structure | 224,131 | Catch Up Repairs | Walls | 1,086 | Future Major Repairs | Ancilliary buildings | 573 | Future Major Repairs | Boundaries | 2,191 | Future Major Repairs | Decorations | 55,525 | Future Major Repairs | Electrics | 35,360 | Future Major Repairs | External doors | 9,147 | Future Major Repairs | Floor coverings | 3,478 | Future Major Repairs | Heating/hw | 29,253 | Future Major Repairs | Internal doors | 14,340 | Future Major Repairs | Kitchens | 50,834 | Future Major Repairs | Lighting | 10,591 | Future Major Repairs | Rainwater goods | 6,387 | Future Major Repairs | Roof | 13,704 | Future Major Repairs | Sanitary ware | 20,320 | Future Major Repairs | Stairs/Balconies/Security | 5,954 | Future Major Repairs | Structure | 3,359 | Future Major Repairs | Windows | 61,084 | Block Improvements | Stairs/Balconies/Security | 31,030 | Dwelling Improvements | Electrics | 565 | Dwelling Improvements | Kitchens | 2,977 | Dwelling Improvements | Walls | 13,395 | | TOTAL | 656,178 |
South Side of Old Bethnal Green Road
The following tables identify by block the refurbishment works proposed in the first 4 years if the transfer goes ahead. | Florida Street 37-53 (odd)
| Essential works to bring all properties up to a good standard | | Structural Works | | Concrete and brickwork repairs | y | External decorations and works to entrance screens | y | Cavity wall insulation | y | Flat roof repair / renewal | y | Parapet repairs | | Pitched roof overhaul | | Additional roof insulation | | Asphalt and balcony repairs | y | Internal Refurbishment | | New kitchen, bathroom and WC | y | New or overhauled heating system | y | New double glazed windows | | Overhaul existing windows | y | Replace / overhaul front entrance door | y | Rewiring or repair existing electrical installations | y | Internal repairs and asbestos removal | y | Services | | Underground drainage repairs | y | Overhaul / replace rainwater goods as necessary | y | Repairs and decoration to communal areas | y | Full replacement of electric laterals and risers | y | Overhaul water tanks | y | Bin chamber refurbishment | y | Overhaul refuse chute | | Lightning protection | y | Replace block lights as necessary | y | Overhaul door entry system | | CCTV installation
(subject to consultation) | y | Lifts | | Overhaul of existing lift | | Works to areas around blocks | | Fencing repairs and decorations | y | Semi-defensible space to ground floor flats | y | Improve hard landscaping and signage | y |
|
|
|