Home  Site Map  Search  Glossary  Contact Us 
   

Lampern Square

11-26 Lampern Sq, 2+3 Nelson Gds. 1-3 Grayling Sq, 18-22 Mullet Gds

  • Should the walkways between the blocks be secured to create separate areas that can be secured by boundary fences and gates linked to a door entry system?
  • Does the block need new windows?
  • What is the condition of the roof? Does it need to be replaced by a pitched roof?
  • Does the block need cavity wall insulation?
  • How can the parking areas on the Estate be secured?

Property Tenanted/Leaseholder Breakdown

Lampern Square

26

16

10

1976

LBTH Estimate for Required Expenditure, 2001

Category Description

Group Name

Total over 30 years

Catch Up Repairs

Ancilliary buildings

378

Catch Up Repairs

Boundaries

4,065

Catch Up Repairs

Decorations

8,014

Catch Up Repairs

Electrics

9,671

Catch Up Repairs

External doors

400

Catch Up Repairs

Floor coverings

1,221

Catch Up Repairs

Floors

342

Catch Up Repairs

Internal doors

2,114

Catch Up Repairs

Kitchens

9,445

Catch Up Repairs

Lighting

572

Catch Up Repairs

Plasterwork

1,446

Catch Up Repairs

Sanitary ware

5,725

Catch Up Repairs

Stairs/Balconies/Security

801

Catch Up Repairs

Structure

20,518

Catch Up Repairs

Walls

3,320

Future Major Repairs

Ancilliary buildings

7,561

Future Major Repairs

Boundaries

2,616

Future Major Repairs

Decorations

40,070

Future Major Repairs

Electrics

12,634

Future Major Repairs

External doors

5,110

Future Major Repairs

Floor coverings

4,276

Future Major Repairs

Heating/hw

33,149

Future Major Repairs

Internal doors

14,618

Future Major Repairs

Kitchens

62,340

Future Major Repairs

Lighting

5,724

Future Major Repairs

Roof

84,991

Future Major Repairs

Sanitary ware

32,240

Future Major Repairs

Walls

3,263

Future Major Repairs

Windows

33,936

Block Improvements

Stairs/Balconies/Security

3,210

Dwelling Improvements

Electrics

2,054

Dwelling Improvements

Kitchens

2,748

Dwelling Improvements

Walls

8,930

TOTAL

427,505

 

 

Proposed Essential Works from Offer Document 4th Draft

North Side of Old Bethnal Green Road

The following tables identify by block the refurbishment works proposed in the first 4 years if the transfer goes ahead.

Lampern Square

 

Essential works to bring all properties up to a good standard

 

Structural Works

 

Concrete and brickwork repairs

y

External decorations and works to entrance screens

y

Cavity wall insulation

y

Flat roof repair / renewal

y

Parapet repairs

y

Asphalt and balcony repairs

y

Internal Refurbishment

 

New kitchen, bathroom and WC

y

New or overhauled heating system

y

New double glazed windows

y

Overhaul existing windows

 

Replace / overhaul front entrance door

y

Rewiring or repair existing electrical installations

y

Internal repairs and asbestos removal

y

Services

 

Drainage repairs

y

Overhaul / replace rainwater goods as necessary

y

Repairs and decoration to communal areas

y

Full replacement of electric laterals and risers

 

Overhaul water tanks

y

Bin chamber refurbishment

y

Lightning protection

y

Replace block lights as necessary

y

Overhaul door entry system

 

CCTV installation

(subject to consultation)

y

Lifts

 

Overhaul of existing lift

 

Works to areas around blocks

 

Fencing repairs and decorations

y

Semi-defensible space to ground floor flats

 

Improve hard landscaping and signage

y

North Side of Old Bethnal Green Road

The following tables identify by block the refurbishment works proposed in the first 4 years if the transfer goes ahead.

Kite Place 1-2

 

Essential works to bring all properties up to a good standard

 

Structural Works

 

Concrete and brickwork repairs

y

External decorations and works to entrance screens

y

Cavity wall insulation

y

Flat roof repair / renewal

y

Parapet repairs

y

Asphalt and balcony repairs

y

Internal Refurbishment

 

New kitchen, bathroom and WC

y

New or overhauled heating system

y

New double glazed windows

y

Overhaul existing windows

 

Replace / overhaul front entrance door

y

Rewiring or repair existing electrical installations

y

Internal repairs and asbestos removal

y

Services

 

Drainage repairs

y

Overhaul / replace rainwater goods as necessary

y

Repairs and decoration to communal areas

 

Full replacement of electric laterals and risers

 

Overhaul water tanks

y

Bin chamber refurbishment

 

Lightning protection

y

Replace block lights as necessary

y

Overhaul door entry system

 

CCTV installation

(subject to consultation)

y

Lifts

 

Overhaul of existing lift

 

Works to areas around blocks

 

Fencing repairs and decorations

y

Semi-defensible space to ground floor flats

 

Improve hard landscaping and signage

y

 

 

 
 

 Copyright  Disclaimer